7. OPERATING ACTIVITY OF THE BUDIMEX GROUP IN 2023, 7.5. Raising standards in the supply chain

[GRI 3-3] [GRI 308-1] [GRI 308-2] [GRI 414-1] [GRI 414-2] [ESRS SMB-3] [ESRS G1-2]]

In connection with the performance of construction processes, the Budimex Group cooperates with a number of suppliers of a variety of goods and services from different sectors of the economy. In accordance with the company’s Integrated Management System procedures, a continuous process of qualification and ongoing evaluation of counterparties is in place, which also takes relevant sustainability aspects into account, that is the responsibility of each entity in observing social and environmental requirements.

The primary purpose of cooperation is to ensure the highest occupational health, safety, quality and environmental standards along with a top degree of operating efficiency, which is why the company prioritizes cooperation with qualified suppliers and subcontractors. Initial evaluation is based on a qualification questionnaire (form PO-04-01-F05 to procedure PO-04-01). Companies interested in cooperation are requested to complete the questionnaire through the system; it is also available for self-completion on our website. Prior to granting the qualification, compliance is verified of the submitted data with public registers (https://podatki.gov.pl, https://aplikacja.ceidg.gov.pl. https://ekrs.ms.gov.pl, https://ec.europa.eu/taxation_customs/vies/#/vat-validation) and private registers (Polish Economic Intelligence, https://www.pwg.info.pl/) along with verification vis-à-vis the Budimex Group’s needs and standards. The following documents are also requested: ISO and AQAP quality certificate(s), ZKP certificate (technical approvals), licenses, authorizations and references. Data from the questionnaires are entered into a database and serve as a primary source of information regarding construction projects when establishing cooperation in a specific area.

A tentatively qualified contractor is any contractor who has declared their compliance with the labor laws and legal requirements for environmental protection applicable in the Republic of Poland.

The bid of any entity responding to the invitation to participate in the procurement process must be consistent with the requirements contained in the list of occupational safety and health, fire safety and environmental protection standards created by the Budimex Group as a supplement to the statutory requirements. The specific manner of fulfillment of each obligation may be agreed upon at the stage of negotiations and selection of the supplier.

The Budimex Group cooperates only with counterparties committed to acting in a responsible manner. In the process of selecting suppliers of materials and services, one of the qualification criteria is the entity’s demonstrated respect for human rights (including labor rights), as governed by the instructions to the procurement procedure (Rules for the qualification and assessment of suppliers of products and services). All of the company’s business partners sign a statement of compliance with the set of rules of conduct for Budimex SA counterparties, while the Budimex Group contractually reserves the right to verify their practices in this area. In accordance with the document, each subcontractor and supplier is required to pursue their business objectives while demonstrating respect for the rule of law, ethical principles and human rights. Integral parts of all contracts signed by the company are the Requirements for occupational safety and health and the Requirements for environmental protection [1]. Cooperation with suppliers in the area of environmental protection at the construction stage is described in more detail in section 4.3.

After the completion of deliveries/services, the supplier’s compliance with human rights is reassessed.

Upon conclusion of the cooperation, the counterparty is evaluated according to the following criteria:

  • timely performance,
  • quality of the product/service,
  • technical potential,
  • fulfillment of pricing conditions,
  • fulfillment of health and safety conditions (applicable only to subcontractors and suppliers of equipment and transportation services),
  • environmental compliance (applicable only to subcontractors and suppliers of equipment and transportation services).


The following aspects are also verified:

  • Has the cooperation with the counterparty been affected by any difficulties, and if so, of what kind?
  • Have any forms of discrimination occurred during the cooperation with the supplier?
  • Have labor rights been respected?
  • Is the supplier recommended for future cooperation?


The rating is calculated by the system based on adopted algorithms and a qualification status is assigned:

  • R, meaning that the counterparty is recommended (favorable evaluation) – average score of more than 4,
  • K, meaning that the counterparty is qualified (favorable rating) – average score from 2.5 to 4 (inclusive),
  • O, meaning that the counterparty is rejected (unfavorable evaluation) – average score below 2.5.


The Budimex Group intends to expand its due diligence procedures in the supply chain in pursuit of its strategic sustainability objectives. The Code of conduct for business partners is scheduled to be developed and adopted in 2024.

Additional information relevant to shaping a responsible supply chain is provided in section 5.2.


Table: New suppliers that were screened using environmental criteria
[GRI 308-1]


Table: Negative environmental impacts in the supply chain and actions taken
[GRI 308-2]



Table: New suppliers that were screened using social criteria
[GRI 414-1]


Table: Negative social impacts in the supply chain and actions taken
[GRI 414-2]






[1] A survey for contractors, a catalog of requirements for contractors, and a set of expected policies can be found at: https://www.budimex.pl/pl/kontrahenci.

0

7. OPERATING ACTIVITY OF THE BUDIMEX GROUP IN 2023, 7.4. Other business

BXF ENERGIA

In April 2023, Budimex SA and Ferrovial S.E. established a new joint venture, BXF Energia, in which they hold a 51% and 49% stake, respectively. The purpose of the joint venture is to initiate and develop large-scale renewable electricity generation projects. This electricity is intended to satisfy part of the Budimex Group’s demand, but may also to be sold to external customers.

BXF Energia’s portfolio includes photovoltaic projects and wind farms at various stages of development with a total capacity of approx. 305 MW at yearend 2023. Moreover, the company continues the construction of the Magnolia and Kamelia large-scale plants acquired by Budimex SA in an M&A transaction. It is also in the process of reviewing potential investments in project at various stages of development with a total capacity of approx. 800 MW.


MAGNOLIA

Wind farm purchased by Budimex SA in 2022 at the ready-to-build phase. It consists of two turbines with a total capacity of up to 7 MW. In January 2023, the project obtained financing under a project finance formula from Bank Gospodarstwa Krajowego. The plant was put into operation in the second half of the year. By the end of December, it generated and fed into the grid 8.2 GWh of electricity.


KAMELIA

A photovoltaic farm project purchased by Budimex SA in November 2022 at the ready-to-build phase. Following the completion of construction work, a 14 MW plant will be put into operation to cover a significant portion of the company’s demand for electricity.


BUDIMEX MOBILITY

In 2022, Budimex Mobility (formerly, Budimex PPP), a member of the Budimex Group, launched operations aimed at establishing a network of publicly accessible electric vehicle charging stations across the country. The company’s technology partner is Elocity, one of the most advanced platforms maintaining vehicle charging stations in Poland.

In 2023, Budimex Mobility put into operation 158 AC stations (slow-charging, alternating-current, 11-44 kW) and DC (fast-charging, direct-current, 30-180 kW) stations, mostly in Wielkopolskie, Zachodniopomorskie, Lubuskie and Kujawsko-Pomorskie voivodships. A significant portion of the charging points made available to the public are chargers acquired by the company through tenders from PGE and the Enea Group.

Moreover, the company is a beneficiary of the EU’s Connecting Europe Facility (CEF) and the National Fund for Environmental Protection and Water Management’s priority program called “Support for electric vehicle charging infrastructure and hydrogen refueling infrastructure.” As part of the Connecting Europe Facility, the company will build 9 charging stations along the TEN-T road network. In turn, aid from the National Fund for Environmental Protection and Water Management is intended for the construction or reconstruction of a publicly accessible network of charging stations with a capacity of no less than 50-150 kW and includes points in five locations.

By 2026, Budimex Mobility intends to make available another 300-350 charging stations to the general public through both a comprehensive organic expansion of its network and acquisitions. The company is also actively working to grow its own electromobility by increasing the share of electric vehicles in the Budimex fleet.

The current list of stations operated by the company may be viewed in the Alternative Fuels Infrastructure Register at: https://eipa.udt.gov.pl/.

0

7. OPERATING ACTIVITY OF THE BUDIMEX GROUP IN 2023, 7.3. Business development in foreign markets

GERMANY

BUDIMEX BAU GMBH

Budimex has been doing business in Germany since the 1970s. In 2004, Budimex Bau was established to ramp up sales in the assembly segment. Its core line of business was the prefabrication of elements made of concrete, reinforced concrete and steel. Since 2021, the company’s offering has been expanded to include general contracting of investment projects in infrastructural, residential, office and industrial construction. Among the company’s currently executed projects is the construction of a road and bridge in Oderberg and the construction of a bridge in Liepe. In August 2023, a major phase of the Liepe project was launched, including the installation of the main girder for the 230-ton structure.



SLOVAKIA

Budimex SA entered the Slovakian market in 2021. Its Bratislava branch office focuses its efforts on infrastructural investments. The team’s dedication to building the company’s image as a reliable and experienced general contractor resulted in signing its first contract on the local market in July 2022 for the construction of the D1/D4 motorway between Bratislava and Triblavina. Work on the project site was launched in 2023.



CZECH REPUBLIC

In December 2022, Budimex SA opened up a branch office in Prague. In 2023, organizational endeavors were carried out to align the firm’s operational activities with the specificity of the local market, including the stringent requirements imposed on construction companies. The branch office employs highly qualified and experienced personnel licensed to carry out construction work in the country. It participates in tenders for infrastructural, railroad, hydrotechnical, residential, office and industrial projects. The team’s efforts culminated in the execution, in late December 2023, of a contract for the construction of the Kutřin polder, as described in more detail in section 7.1.



LATVIA

Latvia is the first of the Baltic States where Budimex SA began offering its services. The company’s Riga branch office was opened in September 2023. Its operations are currently focused on the railroad construction segment, where the company signed a contract in December 2023 marking the inauguration of its operational presence in this part of Europe. The contract provides for the construction of a high-speed rail line within the framework of an international consortium, as described in section 7.1.

0

7. OPERATING ACTIVITY OF THE BUDIMEX GROUP IN 2023, 7.2. Contribution to the development of the infrastructure in Poland and provided municipal services

In 2023, all over Poland, under about 220 contracts, the Budimex Group completed works within general construction, infrastructural building, power engineering, industrial building and railway construction as well as services in the area of waste management and infrastructure maintenance. Selected projects which were completed last year are listed below.

BUDIMEX SA


Expansion of the ferry terminal in Świnoujście

Scope of works:
Rebuilding of ferry stations and transloading ramps as well as modernization of the existing road and railway infrastructure and technical auxiliary facilities in the wharf. The aim of the project was a better integration of the Szczecin-Świnoujście port complex in the North-South sea and land transport corridor, which will contribute to the economic development of the West Pomeranian region and Poland as a whole.
Net contract value: PLN 185 million
Time for completion: 3 years and 11 months



Alteration of A18 motorway

Scope of works:
Adjustment of the south roadway of national road no. 18 with its surroundings to the motorway parameters, construction of 5 bridge structures, including 2 overbridges and 2 animal crossings. The road is highly significant for the industry and tourism because it connects Ukraine, Slovakia and the southern part of Poland with Dresden and Berlin.
Net contract value: PLN 134 million
Time for completion: 3 years



Modernization of E65 railway line on section (LOT C) Vistula river Bridge – Czechowice-Dziedzice – Zabrzeg

Scope of works:
Modernization of the node Goczałkowice-Zdrój – Czechowice-Dziedzice – Zabrzeg. The project included 23 road structures, such as bridges, overbridges, culverts, railway subways and railroad crossings as well as replacement of about 47 km of tracks and 56 km of overhead lines. Modernization also changed platforms at the following stations: Czechowice-Dziedzice, Goczałkowice-Zdrój and Zabrzeg. A modern Local Control Center was established too. All the works were performed during regular railway traffic.
Net contract value: PLN 1.5 billion
Time for completion: 4 years


Construction of a section of S11 expressway

Scope of works:
Construction of a 16.8-kilometer section of the expressway between Koszalin and Zegrze Pomorskie. The construction project included a dual carriageway, numerous engineering structures – bridges, overbridges and underbridges and animal crossings, access roads to service local traffic, motorway service areas and drainage systems. What was also altered were public roads, electric power networks and water supply and distribution networks.
Net contract value: PLN 471 million
Time for completion: 3 years and 6 months



Construction of a bypass of Przecław and Warzymice

Scope of works:
Construction of an over 4-kilometer bypass of Przecław and Warzymice. The project involved completion of a roadway, engineering structures, including overbridges, animal crossings and culverts as well as new stormwater drainage system with three retention tanks. The alteration works pertained to agricultural drainage ditches and telecommunications, electric power and gas networks.
Net contract value: PLN 89 million
Time for completion: 3 years



Expansion of provincial road no. 714

Scope of works:
Expansion of a 2.3 km section of a former district road. A section of provincial road no. 714 was put into operation – extension of Łódź Górna Route connecting Łódź with motorway A1 in the Brójce municipality. Within the project, the roadway was broadened to 7 m and 5 crossings were expanded. In addition, 10 pedestrian crossings were built with conveniences for persons with disabilities, 2 passages for amphibians under the road prism as well as a new bridge on the Ner river. Furthermore, as a result of the project, there are 6 bus bays, 2.1 km of stormwater drainage system, 1.3 km of road ditches and 91 lighting poles.
Net contract value: PLN 30 million
Time for completion: 1 year and 6 months



Construction of a swing bridge in Nowakowo

Scope of works:
Construction of a 103-meter swing bridge on the Elbląg river in the village of Nowakowo. It is a steel structure weighing over 700 tons with a special bearing at the center on its primary support, which allows the bridge to rotate. The project was completed within the construction of water way carried out by Budimex SA, joining the Vistula Lagoon with the Bay of Gdańsk (net contract value: PLN 466 million).
Net contract value: PLN 24 million
Time for completion: 2 years and 3 months



Construction of the Metropolitan Railway Station in Lublin

Scope of works:
Construction of a modern communication hub – three-story building with floor space of over 18 thousand m2 with a Park & Ride garage equipped with chargers for electric vehicles. The facility satisfies the highest sustainability standards.
Net contract value: PLN 267 million
Time for completion: 2 years and 10 months

Construction of the Museum of the History of Poland in Warsaw

Scope of works:
Construction of a 6-storry museum with an area of over 44 thousand m2. The works resulted in the completion of restoration workshops, laboratories, storage areas and office space for employees as well as restaurants, cafes, a cinema, an entertainment hall and a library. More than 30 hectares of green areas were developed and prepared so as to fulfill recreational and leisure functions.
Net contract value: PLN 700 million
Time for completion: 5 years and 3 months



Construction the State Archive in Bydgoszcz

Scope of works: Full-range construction of a four-story building of the State Archive in Bydgoszcz with modern architectural, technological and IT solutions.

Net contract value: PLN 80 million

Time for completion: 1 year and 10 months



Modernization of the Teatr Polski in Szczecin

Scope of works:
Modernization and expansion of over a 100-year old sea of Teatr Polski Theater in Szczecin, including 5 modern stages and the construction of a new reinforced concrete and glass structure incorporated in the slope on the bank of the Odra river.
Net contract value: PLN 170 million
Time for completion: 3 years



Construction of a PepsiCo factory in Środa Śląska

Scope of works:
The construction of a factory with internal installations (including electrotechnical robots), improvement of territory and development of technical infrastructure. The construction project also included a photovoltaic system and a high-class sewage treatment plant for the factory but also charging stations for electric vehicles.
Net contract value: PLN 502 million
Time for completion: 1 year and 8 months




Construction of a technical and operational point for Małopolska Railways

Scope of works:
Designing and construction of a technical support facilities for the rolling stock at the Kraków Towarowy station, including a hall of repairs with a welfare and office section, workshop and storage section, train wash for whole trains and technical section with installations and equipment. Within the construction project, a new layout of stabling and shunting tracks was executed with an overhead line and Railway Traffic Control System.
Net contract value: PLN 79 million
Time for completion: 2 years and 5 months

Detailed current information on the contracts performed by the company is available at: https://media.budimex.pl/category/5321.

 


MOSTOSTAL KRAKÓW SA 

 

Construction of ARM platform

Scope of works:
Designing, constructing and starting up the installation for preparing and charging alternative raw materials, as a result of which it will be possible to use waste from various sectors of the industry in the production of cement. The platform was built in the area of the Kujawy Region Cement Plant and the investor was Lafarge Cement.
Net contract value: PLN 56 million
Time for completion: 18 months



Design and assembly of the charging station for electric buses in Katowice

Scope of works:
Designing, delivery and assembly of fast-charging stations for electric buses in the area of the terminus of Przedsiębiorstwo Komunikacji Miejskiej (Urban Transportation Company) in Katowice, on Tysiąclecia Street.
Net contract value: PLN 2 million
Time for completion: 16 months



Production and delivery of matrices for cathode pads for the Głogów smelter

Scope of works:
Production and delivery of matrices for cathode pads for Section P-7 of the Głogów Copper Smelter, owned by KGHM Polska Miedź.
Net contract value: PLN 5 million
Time for completion: 12 months



FBSERWIS GROUP

In the Gdańsk region, FBSerwis SA is involved in the maintenance of more than 250 km of roads, including sections of S6 (Tri-City bypass), S7 (including the southern bypass of Gdańsk) and S6e (Kashubian Route). The contracts will be performed until 2025. The company also carries out year-round (ongoing and winter) maintenance of more than 90 km of the S5 expressway and more than 45 km of the A2 motorway, on the section from the Modła intersection to the Dąbie intersection in Wielkopolskie voivodship. Contracts for the performance of this work were signed in 2022 for a 4-year term.

Since 2021, the FBSerwis Group has been involved in the management of municipal waste from residential properties in the Warsaw area. Since 2016, it has been providing similar services in Łódź. Continuously since 2013, the Group has also been providing municipal waste collection and management services in the Rzeszów area. It also provides services related to the collection and management of waste from residential properties in Lądek-Zdrój municipality. The contract was signed in April 2022 and will be performed until April 2024.



Since 2017, FBSerwis Wrocław has been responsible for the summer and winter maintenance of cleanliness and order in Wrocław’s Stare Miasto and Krzyki districts.

The FBSerwis Group carries out technical maintenance services for the Gdańsk port, which is one of the largest facilities of its kind in the Baltic Sea basin. The port is a major building block of Trans-European Transport Corridor No. 1. which connects south-eastern Europe with Scandinavian countries. The contract has been performed since 2014.

The company also provides maintenance services for the Koga Office Center located within the Pomeranian Investment Center (PCI). The first contract was signed in 2015, but the services have been provided intermittently.


BUDIMEX MOBILITY 

In 2023, the company put into use 158 publicly available electric vehicle charging stations. Some of these new stations were installed in popular tourist destinations such as Zakopane, Lądek-Zdrój, Jarosław, Krynica and Polanica-Zdrój. For more information about the company’s business and plans, please see section 7.4.

0

7. OPERATING ACTIVITY OF THE BUDIMEX GROUP IN 2023, 7.1. Contracts signed in 2023

[GRI 203-1]

In 2023, the Budimex Group companies signed about 123 new contracts (including annexes). Selected ones are described below.

 

BUDIMEX SA

 

Construction and alteration of railway and road infrastructure between Tychy and Vistula Bridge

Scope of works: Designing and performing full-range construction works including railway and road infrastructure. Performance of construction works concerning trackwork, installation of new overhead lines, access roads and railway crossings, platforms, building a signal tower, as well as electrical grids, gas networks and water supply and sewage collection networks, and also preparation of working plans and specifications and completing housing for railway traffic control systems and railway telecommunication network systems. In addition, 36 road structures will be constructed or altered, such as overbridges, bridges, access subways or culverts. As a result of the project, 47 km of new tracks and 18 turnouts will be built.

Net contract value: PLN 909 million

Planned time for completion: 3 years and 6 months


Modernization and construction of a new railway line Podłęże – Piekiełko in the Podhale region

Scope of works: Modernization of a 6 km section of railway line no. 104 between Chabówka and Nowy Sącz with technical infrastructure along railway line no. 104 from the Chabówka station to the Rabka Zaryte station. The works will be carried out also along railway line no. 98 between Sucha Beskidzka and Chabówka and at the Chabówka station. The modernization will include building a second track and altering road structures and railway traffic control systems, the station and stops. New platforms will be built, among others, at the Rabka Zaryte station and the Rabka-Zdrój stop.

Net contract value: PLN 366 million

Planned time for completion: 2 years


Expansion of national road no. 65 between Gąski and Ełk

Scope of works: Modernization and expansion of the existing DK65 national road. The project will include altering the pavement, correction of road geometry and broadening the roadway and improving its general parameters, as well as building a new bridge in the village of Straduny and demolishing an old structure. The subject matter of the contract is similarly building and rebuilding culverts, crossings, bus termini and bays and sidewalks along DK65 and in the villages of Straduny, Oracze and Wityny.

Net contract value: PLN 186 million

Planned time for completion: 1 year and 6 months


Construction of the 4th stage of Drezdenka bypass

Scope of works: The project continues works started in previous years. A roundabout will be built at the crossing of provincial roads no. 156 and 160 and also a 345-meter bridge over the valley of the Noteć river and overbridge over a railway line. The project will also include construction of 4 passages for agricultural roads and 5 animal crossings and a fence to prevent animals from getting onto the bypass.

Net contract value: PLN 83 million

Planned time for completion: 2 years and 10 months


Construction of bypasses of Ciepielów and Zabierzów

Scope of works: Expansion of a section of national road no. 79 and accompanying technical infrastructure and traffic safety systems. The works include designing and building road structures, environmental protection systems, road lighting, sidewalks and cycling paths and bus bays. The altering work will concern 3 crossings and water supply and distribution networks, power distribution and teletechnical networks.

Net contract value: PLN 658 million

Planned time for completion: 3 years and 1 month


Construction of the installation terminal for offshore wind farms of the ORLEN Group in Świnoujście

Scope of works: Construction of storage areas for components of marine wind turbines, such as towers, blades and nacelles. As part of the investment, communication infrastructure and a new administration and office building will be constructed.

Net contract value: PLN 118 million

Planned time for completion: 1 year and 3 months


Modernization of national road no. 74 between Gorajec and Szczebrzeszyn

Scope of works: Alteration of an 8.7 km section of DK74. including replacement of the structure and pavement and its repair along 1.6 km in Szczebrzeszyn. The project will involve building safe and lighted pedestrian crossings with refuges and road traffic security systems as well as 5 bus bays and 7 additional converging roadways. The Rozłopy-Szperówka crossing will be expanded. Furthermore, private and public exits providing access to areas located near the road will be built or rebuilt. The investment project will include the construction of new bus stops, sidewalks and cycling paths as well as animal crossings.

Net contract value: PLN 119 million

Planned time for completion: 1 year and 11 months


Construction of expressway S8 from Kobierzyce to Łagiewniki

Scope of works: Designing and building expressway S8. The investment is made up of three sections with the total length of 32.5 km. All the structures that will be built are as follows: 9 bridges and 15 overbridges over expressway, 7 overbridges within expressway and 13 culverts, including 12 serving as animal crossings.

Net contract value: PLN 1.07 billion

Planned time for completion: 3 years and 6 months


Construction of flood protection facilities for the valley of the Nysa Kłodzka river

Scope of works: Modernization of flood protection and water infrastructure in the valley of the river aims to improve the flow of flood waters. Work on the construction project will concern, among others, reprofiling the existing floodgates with sectional reinforcement and slope revetments, and also demolition of damaged structures, rebuilding them or building new infrastructure. The shoreline will be also modified.

Net contract value: PLN 121 million

Planned time for completion: 1 year and 11 months


Construction of entertainment and sporting arena in the Szczecin House of Sport

Scope of works: Alteration and expansion of a swimming pool and entertainment and sporting arena in the Szczecin House of Sport covering demolition of existing structures and construction of new ones. Within the project, stands will be built for swimming competitions and a small swimming pool with a wading pool will be rebuilt. In addition, the works will include: repairing the existing main hall, development of the area with ramps, access roads and accessways, technical infrastructure and service connections to outside networks. There will be a photovoltaic system in the area of the facility.

Net contract value: PLN 84 million

Planned time for completion: 3 years


Full modernization of the town stadium in Ząbkowice Śląskie

Scope of works: Modernization and expansion of a multi-functional building of the town stadium. The project will involve the construction of a new building with a cloakroom, generally accessible sanitation room, a lecture hall and office rooms. The facility will be equipped with heat pumps and a photovoltaic system. The car park near the Sunny Arena and Sunny Water Park will be altered, a mini pumptrack will be also built for skateboarding, riding scooters and roller blading, equipped with a rainwater and meltwater small retention system to irrigate nearby sports fields.

Net contract value: PLN 15 million

Planned time for completion: 1 year and 3 months


Modernization of the historic railway station in Grudziądz

Scope of works: Replacement of the exterior facade with the framework and joinery, thermal insulation of the building from the outside and repairing the roof on which photovoltaic panels will be installed. The project will also cover rebuilding and repairing interiors to preserve and reconstruct historic features. The modernized building will be provided with an elevator and ramps and on the underground level, garages and commercial units will be added for passengers. The ground level will have, among others, a hall, waiting area, ticket offices, generally accessible toilets, a station of the Railway Security Service (SOK) and commercial premises.

Net contract value: PLN 60 million

Planned time for completion: 1 year and 8 months


Expansion of Wood-Mizer production establishment in Koło

Scope of works: Construction of a new one-story production and storage hall and two-story part earmarked for office rooms and welfare facilities. Within the project, technical infrastructure will be constructed, including a security service building, bike shelter, a pylon and a car park.

Net contract value: PLN 63 million

Planned time for completion: 1 year and 1 month

In 2023 the company significantly accelerated expansion in foreign markets, which is proved, among others, by winning the following contracts:


Construction of flood protection polder in the Czech village of Kutřín

Scope of works: Building a barrier 146 m long and revitalization of the river on a section 2 km long. The investment includes the construction of a dry retention tank in the village of Kutřín. The facility will form a part of the flood protection system for villages located below the junction of the Krounka and Novohradka rivers. The structure will be 5.67 m wide in the crest on which a paved road will be built. The retention capacity of the structure is 3.6 million m3. and the area of the flooded area when the full retention capacity is achieved will be 67.5 hectares.

Net contract value: PLN 113 million

Planned time for completion: 3 years and 3 months


Construction of high-speed railway line in Latvia

Scope of works: The construction of 230 km of high-speed railway line in Latvia, performed within the Rail Baltica project by the ERB RAIL consortium, whose members are Eiffage Génie Civil (France), Rizzani de Eccher (Italy) and Budimex SA. The project will join the Baltic states to the European railway network by creating a connection between Helsinki and Warsaw. It includes the construction of 175 road structures and 11 animal crossings. Rail Baltica is a project emerging within the Trans-European Transport Network (TEN-T).

Net contract value: PLN 16 billion

Planned time for completion: 8 years

 


MOSTOSTAL KRAKÓW SA 

 

Building charging stations for electric buses in Kraków

Scope of works: Delivery of fast charging stations for electric buses at two bus termini of MPK Kraków, Kurdwanów and Piaski Nowe, with the construction of transformer stations.

Net contract value: PLN 5 million

Planned time for completion: 10 months


Construction of cement mixing system in the Cement Plant in Ożarów

Scope of works: Preparation of engineering plans and specifications, delivery of equipment and the construction of a Green Solution cement mixing system for the Cement Plant in Ożarów.

Net contract value: PLN 22 million

Planned time for completion: 12 months


Delivery and installation of a framework with mechanical assembly for Umicore Poland plant

Scope of works: Production, delivery and assembly of a steel framework for a new production building of the plant in Radzikowice, producing cathode materials used in batteries for electric vehicles.

Net contract value: PLN 52 million

Planned time for completion: 12 months


Construction and assembly of Baltic Hub structure in Gdańsk

Scope of works: Delivery and assembly of steel structure for T3 container terminal built by Budimex SA for Baltic Hub.

Net contract value: PLN 28 million

Planned time for completion: 14 months


Modernization of Avicii Arena in Stockholm

Scope of works: Prefabrication and delivery of a steel structure for the needs of modernization of the Avicii Arena stadium in Stockholm (a contract performed with a Steel Structure Production Plant in Kraków).

Net contract value: PLN 32 million

Planned time for completion: 17 months


Rebuilding of a hothouse for Jagiellonian University

Scope of works: Rebuilding of a hothouse in the area of the Botanic Garden of the Jagiellonian University in Kraków, with expansion by adding utility and technical rooms.

Net contract value: PLN 7 million

Planned time for completion: 12 months


Delivery and assembly of a structure for ZRE Hamburg

Scope of works: Delivery and assembly of a steel structure for building a new unit in the ZRE waste processing plant in Hamburg.

Net contract value: PLN 43 million

Planned time for completion: 15 months


Alteration of the building of the Public Prosecution Service in Lublin

Scope of works: Alteration and repair of one the buildings of the District Public Prosecution Service in Lublin.

Net contract value: PLN 5 million

Planned time for completion: 6 months


Construction of an overpass over the Warta river

Scope of works: Delivery and assembly of a steel structure of a pedestrian and cycling overpass over the Warta river in Poznań, commissioned by Budimex SA.

Net contract value: PLN 59 million

Planned time for completion: 8 months


Construction of a storage facility for KGHM Polska Miedź

Scope of works: Construction of a new storage facility for copper concentrate for the Rudna mine.

Net contract value: PLN 17 million

Planned time for completion: 12 months


Construction of production system for Eco-pea coal for Polska Grupa Górnicza

Scope of works: Designing, delivery and assembly of a steel structure and other works connected with the construction of a production system for Eco-pea coal in the area of the Piast-Ziemowit coal mine.

Net contract value: PLN 21 million

Planned time for completion: 14 months

 


FBSERWIS GROUP

 

 

FBSERWIS SA



Maintenance of road structures managed by the General Board of National Roads and Motorways (GDDKiA), Branch in Katowice, Wysoki Brzeg District

Scope of works: Maintenance of road structures forming sections of A4 motorway, S1 expressway and national road DK44, DK44a, DK94b and DK81. The task of FBSerwis SA is to complete construction works and services of ongoing maintenance of bridges, retaining structures and culverts, including repair, maintenance and renovation works as well as supporting works during inspections.

Net contract value: PLN 10 million

Time for completion: 48 months from the first instruction to proceed with works


Maintenance of roads in winter in the area managed by GDDKiA, Branch in Olsztyn

Scope of works: Winter maintenance of over 80 km S7 and DK22 in the area of Operation and Maintenance Center in Elbląg and Pasłęk – from the border of the voivodship at the level of Elbląg to the Miłomłyn Południe interchange. The tasks of the company will include mainly prevention of slipperiness and liquidating it, removing snow accumulated on the roadway, shoulder and road supporting structures and taking it away.

Net contract value: PLN 21 million

Time for completion: from 1 September 2023 to 10 May 2026


Operation, service, general maintenance and maintenance of efficiency of the infrastructure of the port in Gdańsk in terms of electric power management

Scope of works: General maintenance and operation and technical efficiency maintenance of the electric power infrastructure of sea port in Gdańsk. The Company is responsible, among other things, for the operation and maintenance of electric power networks and systems and transformer stations as well as for maintenance of efficiency of lighting of the port area and electric vehicle charging stations.

Net contract value: PLN 19 million

Time for completion: from 1 March 2023 for 46 consecutive months


Reduction of the electricity consumption by modernization of the infrastructure of external lighting in the city of Konin

Scope of works: Disassembly of existing mercury and sodium light fittings and replacing them with 1404 modern LED fittings with a remote-control system. Under the agreement, FBSerwis SA will also replace 1253 columns of lamp posts with new ones.

Net contract value: PLN 7 million

Time for completion: from 23 November 2023 to 31 July 2024


Collection and management of non-segregated municipal solid waste, commissioned by MZO (Town Waste Treatment Plant) in Wołomin

Net contract value: PLN 8 million

Time for completion: from 2 November 2023 to 30 November 2024



Collection and management of municipal solid waste with selective collection, commissioned by the Andrespol municipality

Net contract value: PLN 5 million

Time for completion: from 1 November 2023 to 30 November 2024



FBSERWIS KAMIEŃSK

Management of non-segregated municipal solid waste and kitchen waste from Łódź

Net contract value: PLN 48 million

Time for completion: from 1 February 2023 to 30 June 2024


Management of municipal solid waste from Warsaw

Net contract value: PLN 30 million

Time for completion: from 11 April 2023 to 11 June 2025


Management of municipal solid waste from real properties, commissioned by Zduńska Wola

Net contract value: PLN 12 million

Time for completion: from 2 January 2024 to 31 December 2024

 


FBSERWIS WROCŁAW

 

Collection of municipal solid waste from the owners of real properties from the Czernica municipality

Net contract value: PLN 10 million

Time for completion: from 1 January 2024 to 30 June 2026


Collection of municipal solid waste from the owners of real properties from the Żórawina municipality

Net contract value: PLN 7 million

Time for completion: from 1 January 2024 to 30 June 2026


Collection and management of municipal solid waste, commissioned by the Stronie Śląskie municipality

Net contract value:
PLN 6 million

Time for completion: from 1 June 2023 to 31 May 2025