7. OPERATING ACTIVITY OF THE BUDIMEX GROUP IN 2023, 7.1. Contracts signed in 2023

7.1. Contracts signed in 2023

[GRI 203-1]

In 2023, the Budimex Group companies signed about 123 new contracts (including annexes). Selected ones are described below.

 

BUDIMEX SA

 

Construction and alteration of railway and road infrastructure between Tychy and Vistula Bridge

Scope of works: Designing and performing full-range construction works including railway and road infrastructure. Performance of construction works concerning trackwork, installation of new overhead lines, access roads and railway crossings, platforms, building a signal tower, as well as electrical grids, gas networks and water supply and sewage collection networks, and also preparation of working plans and specifications and completing housing for railway traffic control systems and railway telecommunication network systems. In addition, 36 road structures will be constructed or altered, such as overbridges, bridges, access subways or culverts. As a result of the project, 47 km of new tracks and 18 turnouts will be built.

Net contract value: PLN 909 million

Planned time for completion: 3 years and 6 months


Modernization and construction of a new railway line Podłęże – Piekiełko in the Podhale region

Scope of works: Modernization of a 6 km section of railway line no. 104 between Chabówka and Nowy Sącz with technical infrastructure along railway line no. 104 from the Chabówka station to the Rabka Zaryte station. The works will be carried out also along railway line no. 98 between Sucha Beskidzka and Chabówka and at the Chabówka station. The modernization will include building a second track and altering road structures and railway traffic control systems, the station and stops. New platforms will be built, among others, at the Rabka Zaryte station and the Rabka-Zdrój stop.

Net contract value: PLN 366 million

Planned time for completion: 2 years


Expansion of national road no. 65 between Gąski and Ełk

Scope of works: Modernization and expansion of the existing DK65 national road. The project will include altering the pavement, correction of road geometry and broadening the roadway and improving its general parameters, as well as building a new bridge in the village of Straduny and demolishing an old structure. The subject matter of the contract is similarly building and rebuilding culverts, crossings, bus termini and bays and sidewalks along DK65 and in the villages of Straduny, Oracze and Wityny.

Net contract value: PLN 186 million

Planned time for completion: 1 year and 6 months


Construction of the 4th stage of Drezdenka bypass

Scope of works: The project continues works started in previous years. A roundabout will be built at the crossing of provincial roads no. 156 and 160 and also a 345-meter bridge over the valley of the Noteć river and overbridge over a railway line. The project will also include construction of 4 passages for agricultural roads and 5 animal crossings and a fence to prevent animals from getting onto the bypass.

Net contract value: PLN 83 million

Planned time for completion: 2 years and 10 months


Construction of bypasses of Ciepielów and Zabierzów

Scope of works: Expansion of a section of national road no. 79 and accompanying technical infrastructure and traffic safety systems. The works include designing and building road structures, environmental protection systems, road lighting, sidewalks and cycling paths and bus bays. The altering work will concern 3 crossings and water supply and distribution networks, power distribution and teletechnical networks.

Net contract value: PLN 658 million

Planned time for completion: 3 years and 1 month


Construction of the installation terminal for offshore wind farms of the ORLEN Group in Świnoujście

Scope of works: Construction of storage areas for components of marine wind turbines, such as towers, blades and nacelles. As part of the investment, communication infrastructure and a new administration and office building will be constructed.

Net contract value: PLN 118 million

Planned time for completion: 1 year and 3 months


Modernization of national road no. 74 between Gorajec and Szczebrzeszyn

Scope of works: Alteration of an 8.7 km section of DK74. including replacement of the structure and pavement and its repair along 1.6 km in Szczebrzeszyn. The project will involve building safe and lighted pedestrian crossings with refuges and road traffic security systems as well as 5 bus bays and 7 additional converging roadways. The Rozłopy-Szperówka crossing will be expanded. Furthermore, private and public exits providing access to areas located near the road will be built or rebuilt. The investment project will include the construction of new bus stops, sidewalks and cycling paths as well as animal crossings.

Net contract value: PLN 119 million

Planned time for completion: 1 year and 11 months


Construction of expressway S8 from Kobierzyce to Łagiewniki

Scope of works: Designing and building expressway S8. The investment is made up of three sections with the total length of 32.5 km. All the structures that will be built are as follows: 9 bridges and 15 overbridges over expressway, 7 overbridges within expressway and 13 culverts, including 12 serving as animal crossings.

Net contract value: PLN 1.07 billion

Planned time for completion: 3 years and 6 months


Construction of flood protection facilities for the valley of the Nysa Kłodzka river

Scope of works: Modernization of flood protection and water infrastructure in the valley of the river aims to improve the flow of flood waters. Work on the construction project will concern, among others, reprofiling the existing floodgates with sectional reinforcement and slope revetments, and also demolition of damaged structures, rebuilding them or building new infrastructure. The shoreline will be also modified.

Net contract value: PLN 121 million

Planned time for completion: 1 year and 11 months


Construction of entertainment and sporting arena in the Szczecin House of Sport

Scope of works: Alteration and expansion of a swimming pool and entertainment and sporting arena in the Szczecin House of Sport covering demolition of existing structures and construction of new ones. Within the project, stands will be built for swimming competitions and a small swimming pool with a wading pool will be rebuilt. In addition, the works will include: repairing the existing main hall, development of the area with ramps, access roads and accessways, technical infrastructure and service connections to outside networks. There will be a photovoltaic system in the area of the facility.

Net contract value: PLN 84 million

Planned time for completion: 3 years


Full modernization of the town stadium in Ząbkowice Śląskie

Scope of works: Modernization and expansion of a multi-functional building of the town stadium. The project will involve the construction of a new building with a cloakroom, generally accessible sanitation room, a lecture hall and office rooms. The facility will be equipped with heat pumps and a photovoltaic system. The car park near the Sunny Arena and Sunny Water Park will be altered, a mini pumptrack will be also built for skateboarding, riding scooters and roller blading, equipped with a rainwater and meltwater small retention system to irrigate nearby sports fields.

Net contract value: PLN 15 million

Planned time for completion: 1 year and 3 months


Modernization of the historic railway station in Grudziądz

Scope of works: Replacement of the exterior facade with the framework and joinery, thermal insulation of the building from the outside and repairing the roof on which photovoltaic panels will be installed. The project will also cover rebuilding and repairing interiors to preserve and reconstruct historic features. The modernized building will be provided with an elevator and ramps and on the underground level, garages and commercial units will be added for passengers. The ground level will have, among others, a hall, waiting area, ticket offices, generally accessible toilets, a station of the Railway Security Service (SOK) and commercial premises.

Net contract value: PLN 60 million

Planned time for completion: 1 year and 8 months


Expansion of Wood-Mizer production establishment in Koło

Scope of works: Construction of a new one-story production and storage hall and two-story part earmarked for office rooms and welfare facilities. Within the project, technical infrastructure will be constructed, including a security service building, bike shelter, a pylon and a car park.

Net contract value: PLN 63 million

Planned time for completion: 1 year and 1 month

In 2023 the company significantly accelerated expansion in foreign markets, which is proved, among others, by winning the following contracts:


Construction of flood protection polder in the Czech village of Kutřín

Scope of works: Building a barrier 146 m long and revitalization of the river on a section 2 km long. The investment includes the construction of a dry retention tank in the village of Kutřín. The facility will form a part of the flood protection system for villages located below the junction of the Krounka and Novohradka rivers. The structure will be 5.67 m wide in the crest on which a paved road will be built. The retention capacity of the structure is 3.6 million m3. and the area of the flooded area when the full retention capacity is achieved will be 67.5 hectares.

Net contract value: PLN 113 million

Planned time for completion: 3 years and 3 months


Construction of high-speed railway line in Latvia

Scope of works: The construction of 230 km of high-speed railway line in Latvia, performed within the Rail Baltica project by the ERB RAIL consortium, whose members are Eiffage Génie Civil (France), Rizzani de Eccher (Italy) and Budimex SA. The project will join the Baltic states to the European railway network by creating a connection between Helsinki and Warsaw. It includes the construction of 175 road structures and 11 animal crossings. Rail Baltica is a project emerging within the Trans-European Transport Network (TEN-T).

Net contract value: PLN 16 billion

Planned time for completion: 8 years

 


MOSTOSTAL KRAKÓW SA 

 

Building charging stations for electric buses in Kraków

Scope of works: Delivery of fast charging stations for electric buses at two bus termini of MPK Kraków, Kurdwanów and Piaski Nowe, with the construction of transformer stations.

Net contract value: PLN 5 million

Planned time for completion: 10 months


Construction of cement mixing system in the Cement Plant in Ożarów

Scope of works: Preparation of engineering plans and specifications, delivery of equipment and the construction of a Green Solution cement mixing system for the Cement Plant in Ożarów.

Net contract value: PLN 22 million

Planned time for completion: 12 months


Delivery and installation of a framework with mechanical assembly for Umicore Poland plant

Scope of works: Production, delivery and assembly of a steel framework for a new production building of the plant in Radzikowice, producing cathode materials used in batteries for electric vehicles.

Net contract value: PLN 52 million

Planned time for completion: 12 months


Construction and assembly of Baltic Hub structure in Gdańsk

Scope of works: Delivery and assembly of steel structure for T3 container terminal built by Budimex SA for Baltic Hub.

Net contract value: PLN 28 million

Planned time for completion: 14 months


Modernization of Avicii Arena in Stockholm

Scope of works: Prefabrication and delivery of a steel structure for the needs of modernization of the Avicii Arena stadium in Stockholm (a contract performed with a Steel Structure Production Plant in Kraków).

Net contract value: PLN 32 million

Planned time for completion: 17 months


Rebuilding of a hothouse for Jagiellonian University

Scope of works: Rebuilding of a hothouse in the area of the Botanic Garden of the Jagiellonian University in Kraków, with expansion by adding utility and technical rooms.

Net contract value: PLN 7 million

Planned time for completion: 12 months


Delivery and assembly of a structure for ZRE Hamburg

Scope of works: Delivery and assembly of a steel structure for building a new unit in the ZRE waste processing plant in Hamburg.

Net contract value: PLN 43 million

Planned time for completion: 15 months


Alteration of the building of the Public Prosecution Service in Lublin

Scope of works: Alteration and repair of one the buildings of the District Public Prosecution Service in Lublin.

Net contract value: PLN 5 million

Planned time for completion: 6 months


Construction of an overpass over the Warta river

Scope of works: Delivery and assembly of a steel structure of a pedestrian and cycling overpass over the Warta river in Poznań, commissioned by Budimex SA.

Net contract value: PLN 59 million

Planned time for completion: 8 months


Construction of a storage facility for KGHM Polska Miedź

Scope of works: Construction of a new storage facility for copper concentrate for the Rudna mine.

Net contract value: PLN 17 million

Planned time for completion: 12 months


Construction of production system for Eco-pea coal for Polska Grupa Górnicza

Scope of works: Designing, delivery and assembly of a steel structure and other works connected with the construction of a production system for Eco-pea coal in the area of the Piast-Ziemowit coal mine.

Net contract value: PLN 21 million

Planned time for completion: 14 months

 


FBSERWIS GROUP

 

 

FBSERWIS SA



Maintenance of road structures managed by the General Board of National Roads and Motorways (GDDKiA), Branch in Katowice, Wysoki Brzeg District

Scope of works: Maintenance of road structures forming sections of A4 motorway, S1 expressway and national road DK44, DK44a, DK94b and DK81. The task of FBSerwis SA is to complete construction works and services of ongoing maintenance of bridges, retaining structures and culverts, including repair, maintenance and renovation works as well as supporting works during inspections.

Net contract value: PLN 10 million

Time for completion: 48 months from the first instruction to proceed with works


Maintenance of roads in winter in the area managed by GDDKiA, Branch in Olsztyn

Scope of works: Winter maintenance of over 80 km S7 and DK22 in the area of Operation and Maintenance Center in Elbląg and Pasłęk – from the border of the voivodship at the level of Elbląg to the Miłomłyn Południe interchange. The tasks of the company will include mainly prevention of slipperiness and liquidating it, removing snow accumulated on the roadway, shoulder and road supporting structures and taking it away.

Net contract value: PLN 21 million

Time for completion: from 1 September 2023 to 10 May 2026


Operation, service, general maintenance and maintenance of efficiency of the infrastructure of the port in Gdańsk in terms of electric power management

Scope of works: General maintenance and operation and technical efficiency maintenance of the electric power infrastructure of sea port in Gdańsk. The Company is responsible, among other things, for the operation and maintenance of electric power networks and systems and transformer stations as well as for maintenance of efficiency of lighting of the port area and electric vehicle charging stations.

Net contract value: PLN 19 million

Time for completion: from 1 March 2023 for 46 consecutive months


Reduction of the electricity consumption by modernization of the infrastructure of external lighting in the city of Konin

Scope of works: Disassembly of existing mercury and sodium light fittings and replacing them with 1404 modern LED fittings with a remote-control system. Under the agreement, FBSerwis SA will also replace 1253 columns of lamp posts with new ones.

Net contract value: PLN 7 million

Time for completion: from 23 November 2023 to 31 July 2024


Collection and management of non-segregated municipal solid waste, commissioned by MZO (Town Waste Treatment Plant) in Wołomin

Net contract value: PLN 8 million

Time for completion: from 2 November 2023 to 30 November 2024



Collection and management of municipal solid waste with selective collection, commissioned by the Andrespol municipality

Net contract value: PLN 5 million

Time for completion: from 1 November 2023 to 30 November 2024



FBSERWIS KAMIEŃSK

Management of non-segregated municipal solid waste and kitchen waste from Łódź

Net contract value: PLN 48 million

Time for completion: from 1 February 2023 to 30 June 2024


Management of municipal solid waste from Warsaw

Net contract value: PLN 30 million

Time for completion: from 11 April 2023 to 11 June 2025


Management of municipal solid waste from real properties, commissioned by Zduńska Wola

Net contract value: PLN 12 million

Time for completion: from 2 January 2024 to 31 December 2024

 


FBSERWIS WROCŁAW

 

Collection of municipal solid waste from the owners of real properties from the Czernica municipality

Net contract value: PLN 10 million

Time for completion: from 1 January 2024 to 30 June 2026


Collection of municipal solid waste from the owners of real properties from the Żórawina municipality

Net contract value: PLN 7 million

Time for completion: from 1 January 2024 to 30 June 2026


Collection and management of municipal solid waste, commissioned by the Stronie Śląskie municipality

Net contract value:
PLN 6 million

Time for completion: from 1 June 2023 to 31 May 2025